Sunday, June 6, 2010
The time has come!
I've been waiting and the time has finally come to begin installation on the terrazzo floor! First my design will be drawn onto the floor in the concourse of the Bemidji Regional Event Center first, then the brass and aluminum goes down, then the terrazzo goes in. I think it will take about 2 months to install and I hope to post progress pics along the way.
Subscribe to:
Post Comments (Atom)
1 comment:
So exciting Barb! So BIG!!
Post a Comment